The day started with Margaret removing this lazarette locker cover
To repair this water damage
Margaret scraped off the wet wood with a screwdriver – she really needs a better tool for this job
Jeff working on the hoses for our fresh water system
The splintered table top
Margaret climbing under the table to remove the screws for the leaf repair project
Jeff preparing for battle
Jeff using the Dremel tool to remove a few stubborn screws
Tomorrow Margaret will continue this repair
You can check out the video of our day’s work here.